Vetted local pros · Independently ranked · Free to use

Hiring a General Contractor for a Remodel: A Homeowner's Pre-Project Checklist

Planning a remodel? Use this pre-project checklist before you hire a general contractor, covering licensing, contracts, payment schedules and permits.

Remodeling & renovations3 min readAugust 2026
In short

Before hiring a general contractor, confirm they are licensed and insured for your state, get a detailed written contract covering scope, timeline and payment schedule, check recent references or reviews, and never pay the full amount upfront. A clear contract protects both sides if something changes partway through the project.

Why a Remodel Goes Wrong Long Before Work Starts

Most remodel disputes trace back to something that was never written down: an assumption about materials, an unclear timeline, or a payment schedule that was never actually agreed. Getting the paperwork right before the first day of work is the single biggest thing you control.

Before You Even Call a Contractor

Have a clear idea of your budget range and must-haves versus nice-to-haves before the first conversation. A contractor cannot give you a meaningful estimate against a vague brief, and you will struggle to compare quotes that were built on different assumptions.

What Should Be in Your Written Contract

  • A detailed scope of work, specific enough that "finish the bathroom" is not the entire description.
  • Named materials and fixtures, not just "standard" or "as selected," so there is no ambiguity later.
  • A realistic timeline with a start date and expected completion window.
  • A staged payment schedule tied to project milestones, not a lump sum.
  • Who pulls permits and who is responsible for passing inspections.
  • A change-order process for anything that comes up mid-project, in writing, before extra work begins.

Before any of that gets signed, ask for two or three references from projects completed in the last year specifically, not just their best-ever job from a decade ago. Recent references tell you how the contractor is running things right now, which is what actually matters for your project.

How Payment Schedules Should Work

A reasonable deposit tied to material costs is normal. What is not normal is paying the full amount upfront, or paying the majority of the project cost before most of the work is actually done. Staged payments against completed milestones protect you if the relationship needs to end early.

Questions to Ask About Permits

Ask directly whether your project needs a permit, and if so, who is responsible for pulling it. A reputable contractor will know the answer immediately rather than guessing, since unpermitted work can cause real problems later, including when you come to sell the home.

Red Flags During the Quoting Process

  • A quote that is dramatically lower than every other bid, with no clear explanation.
  • Reluctance to put the scope of work in writing.
  • Pressure to sign quickly or skip getting other quotes.
  • No verifiable local address, license number, or insurance details.

How we actually vet the contractors on our lists

"Reviews are the biggest thing when it comes to disqualifying a business, though it depends on how they respond to the bad ones. Everyone has an off day, and how a company reacts to a bad review tells you a lot about them. If there are too many bad reviews though, something is clearly up. After that, we look at whether their website and Google Business Profile show real photos of jobs they have actually finished, rather than stock images. Stock photos in a contractor's portfolio is one of the biggest red flags there is," says Stu Clark, founder of Top5HomePros.

Before you request quotes, it is worth starting from our Top 5 general contractors list for your town, since every business on it has already been independently checked for a genuine local presence and track record, rather than found through a generic search.

Frequently Asked Questions

How much should I pay a contractor upfront?

Avoid paying the full amount upfront. A partial deposit tied to material costs is normal, with the remainder staged against project milestones as work is completed.

Do I need a permit for my remodel?

It depends on the scope of work and your local building department's requirements. A reputable contractor will tell you upfront whether a permit is needed and either handle it or guide you through the process.

How many quotes should I get for a remodel?

At least three for anything beyond a small job, comparing the full scope and materials in each quote rather than just the bottom-line price.

What is the difference between a general contractor and a specialty contractor?

A general contractor manages the whole project and coordinates subcontractors. A specialty contractor, such as an electrician, plumber or roofer, handles one specific trade directly.

Find a trusted general contractor near you

See the independently researched Top 5 general contractors in your town, ranked on merit, not who paid the most.

See the Top 5 Contractors →